1. 2006, South Johor Economic Region-Regional Environmental Assessment. I.
  2. 2007, Management Plan for the Preservation of Sg. Melayu Mangrove Riparian Buffer.
  3. 2006, Proposed Waterfront Precint Development (Phase 1) Environmental Impact Assessment.
  4. 2007, Proposed Waterfront Precint Development (Phase 2) Environmental Impact Assessment.
  5. 2006-2007, Proposed Nusajaya Waterfront Precint (Phase 1) Development – Environmental Management Plan (EMP).
  6. 6.    2007, Proposed Nusajaya Waterfront Precint (Phase 2) Development –  Environmental Management Plan (EMP).
  7. 2007-2008, Environmental Monitoring and Auditing for Waterfront (Phase 1) Precinct Development.
  8. 8.    2007, Environmental Monitoring and Auditing for Waterfront (Phase2) Precinct Development, 2007.
  9. 2006, Mapping Environmentally Sensitive Area (ESA) for Kemesah Heights (Kemesah Phase 1).
  10. 2007, Mapping Land Parcels Location of Private Land in Kemesah Using Quickbird Image (Kemesah Phase 2).
  11. 2006, DEIA Study for Proposed Kota Air Mixed Development at Pasir Putih, Pasir Gudang, Johor.
  12. 2007, EMP for the Proposed Phase 1 Arapesona Development.
  13. 2007-2008, Proposed Phase 1 Arapesona Development – Environmental Monitoring and Auditing Monitoring Report ( During Construction) No.1 and No.2.
  14. Cameron Highlands and Batang Padang Hydroelectric Scheme Life Extension Project : Desilting of Ringlet Reservior (Contract No : 247/2005)- Environmental Management Plan – Audit.
  15. 2006-2007, Macro EIA Study of the Proposed Nusajaya Township Development.
  16. 2007, EIA Study of the Proposed Penang Second Crossing.
  17. 2007-2008, Proposed Resort Development on PTD 1338,PTD 1339 and PTD 1340 Mukim Tanjung Surat, Daerah Kota Tinggi, Johor – EIA.
  18.  Detailed Environment Impact Assessment (DEIA) and Hydraulic Study for the Proposed Seri Tanjung Pinang, Phase 2  Development, Tg. Tokong, Penang.
  19.  Detailed Environmental Impact Assessment (DEIA) Study for the Land Reclamation Project Detail Study at Melaka Refinery.
  20. 2008, EIA for Residental North Puteri Harbour Malaysia.
  21.  Study on Noise & Vibration in South Johor due to Singapore Military Activities.
  22. 2008-2010, Projek Lebuhraya Pantai Timur II (Pakej 2) between CH 15100 to CH 26100 – Environmental Audit Report.
  23. 2008-2010, Projek Lebuhraya Pantai Timur II (Pakej 3) between CH 26100 to CH 40038 – Environmental Audit Report.
  24. 2009, Northern Estuary at Nusajaya.